Glasshouse Elevation
A unitised curtain wall retrofit over an existing frame, installed without vacating the floors.
- Surat
- 2023
- Complete
- Exterior
A unitised curtain wall retrofit over an existing frame, installed without vacating the floors.
The building stayed fully tenanted throughout. Unitised panels were craned and fixed from outside on a floor-by-floor sequence, with each storey's old glazing removed and new panels set within a single weekend window, so no tenant lost a working day.
- Withheld
- Commercial
- Exterior
- Surat
- 2023
- Complete
- 12 storeys · 6,800 m² facade · unitised system
Seen closer.
Exterior
- — Facade design
- — Envelope detailing
- — Material specification