North Overpass
Grade separation across a live arterial road, staged so traffic never fully stopped.
- Rajkot
- 2022
- Complete
- Civil
Grade separation across a live arterial road, staged so traffic never fully stopped.
The road below carries roughly forty thousand vehicles a day and could not close. Construction was staged in eleven phases with night possessions only, using precast beams launched from the verge so the carriageway was never occupied by falsework.
- State highways
- Infrastructure
- Civil
- Rajkot
- 2022
- Complete
- 3-span · 96 m total · precast beams