sthapati
Concrete bridge span seen along its length

Spanworks Crossing

A pedestrian river crossing — post-tensioned deck, single pier, forty-metre clear span.

Location
Vadodara
Year
2023
Status
Complete
Discipline
Civil

01 / The problem

A pedestrian river crossing — post-tensioned deck, single pier, forty-metre clear span.

A single pier was the brief's hardest constraint: the riverbed geology allowed one foundation, not two. The deck is post-tensioned and asymmetric, counterweighted on the shorter approach so the whole crossing balances on that one point without a visible truss.

02 / Specification

Client
Municipal
Sector
Infrastructure
Discipline
Civil
Location
Vadodara
Year
2023
Status
Complete
Scope
40 m clear span · 3.5 m deck · single pier

Project details are illustrative — see lib/data/projects.ts

03 / Gallery

Seen closer.

Click any image to open · arrow keys to move · escape to close

04 / Carried by

Civil

  • Structural planning
  • Site survey
  • Execution oversight
05 / More

More infrastructure work.

All projects